What Causes Change Orders on a Custom Home Blog Post Cover Image

July 2, 2026  ·  James Cox

What Causes Change Orders on a Custom Home?

One of the questions we're asked most often is, "How can we avoid change orders?"

It's a great question because no homeowner enjoys unexpected costs or delays. While some changes are unavoidable, many can be prevented with careful planning before construction begins.

Our goal is never to eliminate flexibility—we understand that ideas evolve—but rather to help our clients make informed decisions early so construction can move smoothly.

What Is a Change Order?

A change order is simply any modification to the original scope of work after construction has begun.

Sometimes that means adding something new. Other times it means changing a product, relocating a wall, or upgrading a finish that was previously selected.

Not all change orders are negative. In fact, some result in homes our clients love even more. The important thing is understanding that changes made during construction often have ripple effects on cost and schedule.

The Most Common Causes of Change Orders

1. Design Decisions Made Too Late

The earlier decisions are made, the easier and less expensive they are to implement.

Waiting until framing is complete to decide where a television will hang or where furniture will be placed can mean relocating electrical outlets, blocking, or lighting.

Thoughtful planning before construction begins is one of the best ways to reduce unnecessary changes.

2. Finish Selections That Evolve

It's common for homeowners to discover new products or finishes during the building process.

Maybe a different countertop catches your eye or you decide you'd prefer wide-plank hardwood flooring over the original selection.

There's nothing wrong with changing your mind—it simply may affect both the budget and the construction schedule.

3. Hidden Conditions

Sometimes a project reveals surprises that couldn't have been known during planning.

Examples might include unexpected soil conditions, underground utilities, existing structures, or municipal requirements that only become apparent after work begins.

These situations aren't anyone's fault, but they occasionally require adjustments to the project.

4. New Ideas During Construction

One of the exciting aspects of building a custom home is seeing your vision come to life.

As spaces begin to take shape, it's natural for homeowners to think of additional features such as built-in cabinetry, accent lighting, outdoor amenities, or smart home upgrades.

These improvements can certainly add value, but they also represent changes to the original scope of work.

How We Help Minimize Change Orders

We believe the best way to reduce change orders is through preparation.

That's why we invest significant time before construction begins by developing:

  • A detailed construction budget
  • Comprehensive specifications
  • Thorough plan reviews
  • Coordination meetings with the design team
  • Finish selection guidance
  • Regular communication with our clients

The more decisions that are made before breaking ground, the more predictable the building experience becomes.

Communication Is Key

Even with the best planning, some changes are simply part of creating a truly custom home.

When they occur, we believe homeowners deserve clear communication.

Before any work is performed, we discuss how the requested change may impact cost, schedule, and other areas of the project. This allows our clients to make informed decisions without surprises.

Our Philosophy

A custom home should reflect your family's lifestyle—not just the plans on paper.

Some changes are part of that journey, and we're here to guide our clients through those decisions with honesty and transparency.

Our objective isn't to avoid every change order. It's to minimize unnecessary ones through thoughtful planning while making the necessary ones as smooth and predictable as possible.

With clear communication, detailed preparation, and a collaborative approach, change orders become manageable conversations rather than stressful surprises.